This is a expansion / renovation of Gillette Stadium, located at Foxborough, MA. It consist of 3 parts (N, NE, NW) with framing of Video board (5 levels), Light house (15 levels) and middle portion (3 levels). Part NE & NW contains trusses with camber and light-house have sloped columns with vertical braces. This complete structure is complex in nature.
Tonnage
Schedule
This is a expansion / renovation of Gillette Stadium, located at Foxborough, MA. It consist of 3 parts (N, NE, NW) with framing of Video board (5 levels), Light house (15 levels) and middle portion (3 levels). Part NE & NW contains trusses with camber and light-house have sloped columns with vertical braces. This complete structure is complex in nature.
All main steel and secondary steel are in scope for detailing and need to be detailed in 75 sequences.
This complete structure is complex and coordination with existing steel is additional critical part of this project.
We are coordinating with fabricator to simplify the framing and get field / existing information. Critical areas were handled with more attention by senior staff and were thoroughly reviewed at regular intervals.