CMH062 Building 5

New Albany, OH

This is composite structure having two floors & screen wall above. Outside of building there is equipment structure having grating floors.

2800

Tonnage

16 Weeks

Schedule

CMH062 Building 5
CMH062 Building 5
CMH062 Building 5

This is composite structure having two floors & screen wall above. Outside of building there is equipment structure having grating floors.

At second floor composite slab & @ roof deck with roof material. Out side walls are precast wall & co-ordinated with precaster for steel connection to wall. Misc. steel by others, co-ordianted with stair detailer for connection with ours steel.