Fort Gordon, GA

SCI Mission (USACE Cyber Building) is one of the biggest government in Fort gordon. This building size is about 500’-0 x 300’-0 with 2000  tons of steel.

2000

Tonnage

16 Weeks

Schedule

Steel detailing
SCI Mission

SCI Mission (USACE Cyber Building) is one of the biggest government in Fort gordon.

This building size is about 500’-0 x 300’-0 with 2000  tons of steel.

It has 6 Areas in it, with 20 steel Sequences . Having 5 Floors. Screen wall Areas, Dumpsters….

North Area, Connector Area and South bar area.

It is an Fast track project and Almost 25 members  are currently working on this  job.  At a Single time, Erector using 2 Cranes due to aggressive schedule.
It also have MISC items (Stairs 01 thru 05, Ladders, Louvers, Bollards, CMU wall supports, Knee wall post, Lintels …

It is having  full of Side plate connections, Moment connections . Also Connection design in our scope.